Energy Cell - 600/minAuthor: bobismeDownloads: 230 Original Upload: 2025-02-16 Last Update: 2025-02-16 |
Energy Cells, 600/min Input - Xeno Plate (300/min), Glass (600/min), Elec Comp (600/min), Olumic Acid (6000L/min) 50 Fluid Assemblers If you widen the bus belts you can tile this blueprint. size: 35x4x45
|
|
Download |
Steel Beam - 160minAuthor: bobismeDownloads: 271 Original Upload: 2025-02-16 Last Update: 2025-02-16 |
|
Download |
Starter Mall - Loaders & BeltsAuthor: bobismeDownloads: 342 Original Upload: 2025-02-16 Last Update: 2025-02-16 |
Starter Mall for Loader & Belts Output: Loader, Loader (2nd Lane), Belt1, Balancer1, Ramp1 1 Assemblers for each, each container limited to 2 slots by default. Basic setup, for the initial without a 3rd lane loader yet and more throughput needs. Single blueprint for all starting building needs. 'Starter Mall Loaders 1,2' have higher throughput and more useful in combination with larger mall. This blueprint can be standalone during your initial start to get building. Signs used for labels, not needed for clarity or understandings. size: 15x4x12
|
|
Download |
Starter Mall - Basic BuildingsAuthor: bobismeDownloads: 314 Original Upload: 2025-02-16 Last Update: 2025-02-16 |
Starter Mall for Basic Buildings Output: Assembler 1, Smelter (small), Crusher 1, Drone Miner 1, Container 1 1 Assemblers for each, each container limited to 2 slots by default. Basic setup, for the initial without a 3rd lane loader yet and more throughput needs. size: 15x4x12
|
|
Download |
Starter Mall - Building BlocksAuthor: bobismeDownloads: 421 Original Upload: 2025-02-16 Last Update: 2025-02-16 |
Starter Mall for Building Blocks Output: Building Blocks 7 Assemblers. Good starting setup, easy for initial world. Signs used for labels, not needed for clarity or understandings size: 25x4x11
|
|
Download |
Starter Mall - Loaders 1,2Author: bobismeDownloads: 272 Original Upload: 2025-02-16 Last Update: 2025-02-16 |
Starter Mall for Loaders (1st Lane & 2nd Lane) Output: Loader, Loader (2nd Lane) 2 Assemblers for each, initial setup without 3rd lane loader and more throughput. Basic setup, good for initial world. size: 12x4x12
|
|
Download |
Mall - Construction MaterialAuthor: bobismeDownloads: 264 Original Upload: 2025-02-13 Last Update: 2025-02-13 |
Construction Material, 2 Assemblers. Basic Setup, expandable to any size. Output: Construction Material 2 Assemblers are combined. If need more than 2 assemblers move 2nd output to match 1st, then tile along input bus. size: 11x4x11
|
|
Download |
Mall - Warehouse & ShipsAuthor: bobismeDownloads: 262 Original Upload: 2025-02-13 Last Update: 2025-02-13 |
Warehouse & Ships Output: Construction Ship Port, Transport Ship Port, Sales Warehouse (Assembly Line), Construction Warehouse, Sales Warehouse, Space Station Requester Warehouse. Inputs: Adv. Mach Part / Circuit Board / Steel Beam / Elec Comp / Polymer Board / Energy Cell / Low Density Olumite. All items goes to same containers. Item counts are limited by Assembler. Currently set between 2-8 of each. size: 11x5x36
|
|
Download |
Mall - Ship PadsAuthor: bobismeDownloads: 242 Original Upload: 2025-02-13 Last Update: 2025-02-13 |
Ship Pads. Output: Cargo Ship Start Pad, Cargo Ship Target Pad, Cargo Ship Start Pad (Liquids), Cargo Ship Target Pad (Liquids). Inputs: Steel Beam / Adv. Mach Part / Circuit Board / Glass All items goes to same containers. Item counts are limited by Assemblers. Currently set to 4 pads of each. Adjust as desired. size: 11x5x18
|
|
Download |
Mall - Power Cables & PolesAuthor: bobismeDownloads: 216 Original Upload: 2025-02-13 Last Update: 2025-02-13 |
Power Cables & Power Poles. Output: Power Line, Power Pole (Wall-Mounted), Power Pole (Small), Power Pole (Large). Inputs: Steel Beam, Polymer Board, Xeno Plate, Elec Comp, Tech Rod. All items goes to same containers. Item counts are limited by Data Evaluators. Currently set to, Small Pole / Wall Pole = 50, Large Pole = 20, Power Line = 100. Adjust as desired. size: 10x5x23
|
|